An emergency response to a malfunction in the main pumping line of the Al-Ashary project
The volunteers of the Syrian Arab Red Crescent, in cooperation with the Daraa Water Corporation, responded to a malfunction in ...
$l10n
parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script()
function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /var/www/vhosts/sarc.sy/httpdocs/wp-includes/functions.php on line 5665The volunteers of the Syrian Arab Red Crescent, in cooperation with the Daraa Water Corporation, responded to a malfunction in ...
After continuous work and efforts in coordination between the Syrian Arab Red Crescent and the TGH organization, the second phase ...
© 2021