Meeting the needs of the people in Swaida of bread requires increasing the production of the bakeries that are affected by the electricity suspension and power generators failures.The water and sanitation team at SARC Swaida Branch provided the bakeries with electric generation set with the capacity of 300 KVA for the automatic bakery in Swaida City and with the capacity of 80 KVA for the reserve bakery in AlQrayya Town, The generators are provided by ICRC.
[g_slider source=”media: 33763,33764″ limit=”52″ link=”image” title=”no”]
[/g_slider]