SARC – Aleppo sheltering team closed opened holes (that were supposed to be replaced with elevator’s doors) of 33 buildings in Al-Sakan Al-Shababi, Maysalon to protect residents from risky downfall.
The work was conducted on 3 phases, each involved 11 buildings. The project, which was carried out on two months, will support 635 families including 3292 individuals.
Sheltering team responds to people’s applications and complains to fix damaged buildings meeting needed criteria after full assessment.
Photo: SARC