The joint water project of the Syrian Arab Red Crescent and the International Committee of the Red Cross finished the construction works of the river jurf of al-Kasra station which benefits more than 200 thousands people from Rural Deir Ezzor governorate.
These works was a result to the abundance of water flow in Euphrate river recently which led to the collapse of the river jurf between al-Kubr and al-Kasraaa water plants. The works include removing the remnants of the collapsed jurf and paving it with Basalt rocks.
It is worth mentioning that al-Kubr water station provide water to al-Kasra station with a capacity of 600 m3/h and this mission has lasted for two months.